A leaky 17 kg bucket is lifted from the ground to a height of 62 m at a constant speed with a rope that weighs 0.2 kg/m. Initially the bucket contains 32 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 62-m level. How much work is done? 

in Calculus Answers by

Your answer

Your name to display (optional):
Privacy: Your email address will only be used for sending these notifications.
Anti-spam verification:
To avoid this verification in future, please log in or register.

1 Answer

Question: A leaky 17 kg bucket is lifted from the ground to a height of 62 m at a constant speed with a rope that weighs 0.2 kg/m. Initially the bucket contains 32 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 62-m level. How much work is done?

Loss of weight of water from bucket is 32 kg over a distance of 62 m  = 32/62 kb/m = 16/31 kg/m.
Weight of bucket, including water, at distance x from ground is Wb = 17 + 32 – (16/31).x kg
Weight of rope diminishes by 0.2 kg for every metre the bucket is drawn upwards.
Initial length of rope is 62 m.
Initial weight of rope, being pulled up is, 62*0.2 = 12.4 kg
Length of rope when at a distance x m from the ground is 62 – x m.
Weight of rope when at a distance x m from the ground is Wr = (62 – x)*0.2 = 12.4 – 0.2.x kg.
Total weight being lifted at distance of x m from ground is W = Wb + Wr
W = (49 – (16/31).x) + (12.4 – 0.2.x) = 61.4 – (111/155).x

Work done over a small distance δx
δW=F∙δx
Where the lifting force, F, is just equal to the current weight, Wg.

Total work done
WD=∫dW=∫_0^x F dx=∫_0^62 Wg dx
WD=g∫_0^62 61.4 – (111/155).x dx
WD=g(61.4x - (111/155).x^2/2)   [62 ..0]
WD=9.81(3,806.8 - 1376 2/5)
WD=23,842 J
WD=24KJ


A quicker way to do this problem is to notice that the rates (of loss of weight) are linear relationships. E.g. 0.2.x kg/m rather than 0.2.x^2 kg/m.
Since the relationships are linear, then just take average values and work from that.
Weight of rope = 62*0.2 = 12.4 kg.
Average weight of rope = 6.2 kg.
Average weight of water = 32/2 = 16 kg.
Weight of bucket (constant) = 17 kg.
Average weight being lifted = 17 + 16 + 6.2 = 39.2 kg
Distance over which the average weight is being lifted = 62 m.
Work done = Fx = Wg.x = 39.2*g*62 = 23,842.224 J = 24 KJ
 

by Level 11 User (81.5k points)

Related questions

1 answer
asked Jan 13, 2015 in Other Math Topics by Mari | 1.1k views
1 answer
asked Feb 18, 2021 in Calculus Answers by karan91 Level 2 User (1.3k points) | 477 views
1 answer
2 answers
asked Dec 8, 2020 in Other Math Topics by anonymous | 576 views
1 answer
asked Oct 21, 2022 in Calculus Answers by Ash | 479 views
1 answer
1 answer
asked Sep 29, 2021 in Calculus Answers by anonymous | 938 views
Welcome to MathHomeworkAnswers.org, where students, teachers and math enthusiasts can ask and answer any math question. Get help and answers to any math problem including algebra, trigonometry, geometry, calculus, trigonometry, fractions, solving expression, simplifying expressions and more. Get answers to math questions. Help is always 100% free!
87,516 questions
100,285 answers
2,420 comments
735,127 users